Construction progress and builder's log for my Van's RV-7 project N769WB
Labels
Aileron
(31)
Avionics
(72)
Canopy
(80)
Cowl
(28)
Electrical
(39)
Elevators
(36)
Empennage
(94)
fiberglass
(22)
Firewall Forward
(57)
Flap
(43)
Fuel System
(23)
Fuel Tank
(4)
Fuselage
(156)
Horizontal Stabilizer
(25)
Interior
(27)
Landing gear
(10)
Paint Schemes
(2)
Parachute
(30)
prop
(2)
Rudder
(13)
Vertical Stabilizer
(14)
Wing
(133)
Wing tip
(2)
Wiring
(18)
Friday, November 9, 2012
Worked on right rear spar: 2.7 hours
Got the right rear spar prepped and primed. Now ready to rivet. Definitely went faster than the left.
Priming done.
Ready to rivet.
Newer Post
Older Post
Home