More rib prep: 2.5 hours
Finished fluting left wing ribs.
Located and drilled holes for electrical conduit, and snap bushings for pitot line, aoa line and antenna cables.
Transferring pilot holes rib to rib.
The large hole is for the flexible conduit and the 3 small ones are for aoa, antenna and pitot lines.