There was a fair amount of work accomplished over the summer despite another trip to Europe for paragliding the last week of August!
Labels
Sunday, December 10, 2023
Update for 3rd quarter 2023:
Friday, April 19, 2013
Finished fuel tank install, started wing cradle: 6.5 hours
I dimpled all the holes in the tank and joint strip for #8 screws, installed the many nut plates on the joint strip then installed the tank. The tank was installed in a temporary fashion with just enough screws and bolts for verifying the fit. (The tank has to be removed to fit the wing to the fuselage.)
I also made a lot of progress starting the cradle that will hold the wing for the rest of its assembly and storage.
Thursday, April 18, 2013
More fuel tank mounting prep: 6 hours
Today involved a lot of hole drilling. I re-attached the tank and opened up the joint strip screw holes to final size. Then I took the tanks off and used my #8 nut plate jig to drill the rivet holes for the approximately 30 nut plates on the joint strip. Then I countersinked all the rivet holes.
I also prepped the holes on the z brackets for their nut plates. After deburring all the various holes I installed the nut plates on the tank z brackets.
Wednesday, April 17, 2013
Started fitting left fuel tank: 5.7 hours
Getting the fuel tank fitted involved several rounds of temporarily attaching and removing the tank. Then I drilled the pilot holes for the screws in the joint plate. The object was to get a smooth transition between the tank and the other skins n the wing. I initially had some "pillowing" of the skin around the leading edge joint plate (which appears to be a common occurrence).
I ended up eventually adding additional screws to the joint plate to hold the skin more snug to the joint plate. This is one of the options used by other builders.
I also drilled the holes in the tank brackets for the 3/16 bolts that hold the tanks to the spar.