Worked on wing tie down brackets: 6 hours
Worked on match drilling the tie down brackets. This took a while due to lining up and drilling through the spacers.
I also drilled the spacers and tie downs for the plate nut rivets. Then I primed the tie down blocks.
Tie down bracket with removable stainless tie down ring:
Tie down spacers: