Construction progress and builder's log for my Van's RV-7 project N769WB
Labels
Aileron
(31)
Avionics
(72)
Canopy
(80)
Cowl
(28)
Electrical
(39)
Elevators
(36)
Empennage
(94)
fiberglass
(22)
Firewall Forward
(57)
Flap
(43)
Fuel System
(23)
Fuel Tank
(4)
Fuselage
(156)
Horizontal Stabilizer
(25)
Interior
(27)
Landing gear
(10)
Paint Schemes
(2)
Parachute
(30)
prop
(2)
Rudder
(13)
Vertical Stabilizer
(14)
Wing
(133)
Wing tip
(2)
Wiring
(18)
Thursday, November 8, 2012
Finished left rear spar prep, started on right: 6.4 hours
Riveted all left rear spar components together. I had a two tricky rivets that had to be redone but everything else went well.
After that I started prepping the rear spar components.
Riveting the aileron bracket doubler:
Inboard spar doublers (extra holes are where ribs and other parts are riveted during assembly):
Ready to trim right rear spar doublers: