Construction progress and builder's log for my Van's RV-7 project N769WB
Labels
Aileron
(31)
Avionics
(72)
Canopy
(80)
Cowl
(28)
Electrical
(39)
Elevators
(36)
Empennage
(94)
fiberglass
(22)
Firewall Forward
(57)
Flap
(43)
Fuel System
(23)
Fuel Tank
(4)
Fuselage
(156)
Horizontal Stabilizer
(25)
Interior
(27)
Landing gear
(10)
Paint Schemes
(2)
Parachute
(30)
prop
(2)
Rudder
(13)
Vertical Stabilizer
(14)
Wing
(133)
Wing tip
(2)
Wiring
(18)
Tuesday, November 6, 2012
Finished tie down assemblies and attached to spars: 3.2 hours
Riveted the spacers and nut plates to the tie down brackets then bolted them and the aileron bell rank brackets to the spars.
Competed tie down assembly:
Aileron bell crank brackets:
Newer Post
Older Post
Home