Smoothed all the edges on the left wing ribs. I also started straightening the flanges and fluting the ribs.
Labels
Aileron
(31)
Avionics
(72)
Canopy
(80)
Cowl
(28)
Electrical
(40)
Elevators
(36)
Empennage
(94)
fiberglass
(22)
Firewall Forward
(58)
Flap
(43)
Fuel System
(23)
Fuel Tank
(4)
Fuselage
(156)
Horizontal Stabilizer
(25)
Interior
(27)
Landing gear
(10)
Paint Schemes
(2)
Parachute
(30)
prop
(2)
Rudder
(13)
Vertical Stabilizer
(14)
Wing
(133)
Wing tip
(2)
Wiring
(18)
Thursday, November 22, 2012
Thursday, November 15, 2012
Friday, November 9, 2012
Worked on right rear spar: 2.7 hours
Got the right rear spar prepped and primed. Now ready to rivet. Definitely went faster than the left.
Labels:
Wing
Thursday, November 8, 2012
Finished left rear spar prep, started on right: 6.4 hours
Riveted all left rear spar components together. I had a two tricky rivets that had to be redone but everything else went well.
After that I started prepping the rear spar components.
After that I started prepping the rear spar components.
Labels:
Wing
Wednesday, November 7, 2012
Started on left rear spar: 9 hours
I got the left rear spar all the way to the point of riveting.
There was a fair amount of time spent reviewing the plans and researching techniques online. I think the right rear spar will go a bit faster.
I did all the edge finishing on the rea spar components, then I match drilled all the doublers to the rear spar. After I made some modifications (grinding) to the pneumatic squeezer I was able to dimple the appropriate holes on the rear spar and doublers. Then I scuffed and cleaned everything. Then primed all pieces. Tomorrow I will rivet it all together.
There was a fair amount of time spent reviewing the plans and researching techniques online. I think the right rear spar will go a bit faster.
I did all the edge finishing on the rea spar components, then I match drilled all the doublers to the rear spar. After I made some modifications (grinding) to the pneumatic squeezer I was able to dimple the appropriate holes on the rear spar and doublers. Then I scuffed and cleaned everything. Then primed all pieces. Tomorrow I will rivet it all together.
Making the clearance hole for the aileron pushrod in one of the doublers (the Dremel has been indispensable)
Labels:
Wing
Tuesday, November 6, 2012
Finished tie down assemblies and attached to spars: 3.2 hours
Riveted the spacers and nut plates to the tie down brackets then bolted them and the aileron bell rank brackets to the spars.
Labels:
Wing
Monday, November 5, 2012
Worked on wing tie down brackets: 6 hours
Worked on match drilling the tie down brackets. This took a while due to lining up and drilling through the spacers.
I also drilled the spacers and tie downs for the plate nut rivets. Then I primed the tie down blocks.
I also drilled the spacers and tie downs for the plate nut rivets. Then I primed the tie down blocks.
Labels:
Wing
Subscribe to:
Posts (Atom)