Thursday, December 7, 2017

Finished VPX wiring: 5 hours


  • Wired all the switches on the instrument panel that connect to the VPX.
  • Completed the J1 input connector for the VPX - this completes all VPX wiring. Next step will be configuring and testing the unit.
  • Made ground wire daisy chain for all VPX switches
  • Completed J244 connector for GEA 24 interface box. This connector only has 4 pins used: Take off / go around and autolevel for autopilot and left and right fuel tank quantity.


All VPX connectors complete:

All VPX switch wiring in place (all labeled and organized):

A lot of wires for the J1 connector:

Lighting switches connected to VPX and ground:

Only using 4 pins on this huge connector: