Sunday, November 5, 2017

Finished one ADAHRS connector plus more wiring!: 6 hours


  • Ran the wire for the GMU 22 magnetometer which will mount in the right wing tip. This wire will remain coiled in the wing root until the wing is on.
  • Connected the GMU 22 wires to the #1 ADAHRS data connector. This connector also provides power for the GMU 22.
  • I did some research and then ran 3 conductor shielded wire for the outside air temp probe which will go under the left wing
  • Ran the left and right fuel tank quantity wires
  • Connected the outside air temp wires to the ADAHRS.
  • Ran the RS-232 wires from the ADAHRS to the GTX 23 transponder
  • Assembled the backshell for the ADAHRS connector and connected it!


The completed ADAHRS 1 data connector - 11 pins used plus 4 shield drains:

Adding wires to the connector: