Construction progress and builder's log for my Van's RV-7 project N769WB
Labels
Aileron
(31)
Avionics
(72)
Canopy
(80)
Cowl
(28)
Electrical
(39)
Elevators
(36)
Empennage
(94)
fiberglass
(22)
Firewall Forward
(57)
Flap
(43)
Fuel System
(23)
Fuel Tank
(4)
Fuselage
(156)
Horizontal Stabilizer
(25)
Interior
(27)
Landing gear
(10)
Paint Schemes
(2)
Parachute
(30)
prop
(2)
Rudder
(13)
Vertical Stabilizer
(14)
Wing
(133)
Wing tip
(2)
Wiring
(18)
Thursday, May 25, 2017
Oil cooler elbow work: 2 hours
Sanded and scuffed the new fiberglass reinforcement in preparation to apply some microballoons to the whole elbow.
I also added some flox to reinforce the flanges where the elbow will mount to the oil cooler.
Flox (on inside of elbow) curing:
Newer Post
Older Post
Home