Baggage floors and misc: 6.3 hours

During this session I finished the installation of the baggage floors which including prepping the left baggage floor and doing all riveting. I also installed the elevator bell crank and installed the autopilot pitch servo. I also started working on the antenna doublers for the comm radio and transponder. Lastly I spent some time researching when to install the aft parachute harness.

Right baggage floor complete:

Left baggage floor in progress:

Left baggage floor blind rivets done:

Both baggage floors complete:

Installing elevator bell crank:

Autopilot pitch servo installed: