Labels

Thursday, July 3, 2014

Baggage floor work: 4 hours

During this session: drilled access holes in baggage bulkhead for BRS parachute activation cable and the autopilot servo wire harness. I also installed wire clips in the control tunnel, match drilled the right baggage floor in place, deburred and started riveting the right floor in place.

 Right baggage floor in progress:

Wire clips in pushrod tunnel: