Labels

Saturday, September 1, 2012

More left elevator prep: 6 hours

I got the lead counterweight drilled then temporarily assembled the skeleton and skin and match drilled everything. I also got started deburring the spar and several other pieces.

 

There's a lot more going on with the left elevator then any piece so far.