Labels

Friday, September 28, 2012

Finished trim tab and rolled left elevator leading edge: 8.2 hours

The trim servo is mounted and working good. I also rolled the left leading edge. Next steps are going to be rolling the right leading edge and fitting the elevators to the horizontal stabilizer.

 

Trim servo with pushrod on access plate ready to be mounted to the underside of the left elevator.
 

Rolling...
 

Duct tape is very important stuff for this operation.