Construction progress and builder's log for my Van's RV-7 project N769WB
Labels
Aileron
(31)
Avionics
(72)
Canopy
(80)
Cowl
(28)
Electrical
(39)
Elevators
(36)
Empennage
(94)
fiberglass
(22)
Firewall Forward
(57)
Flap
(43)
Fuel System
(23)
Fuel Tank
(4)
Fuselage
(156)
Horizontal Stabilizer
(25)
Interior
(27)
Landing gear
(10)
Paint Schemes
(2)
Parachute
(30)
prop
(2)
Rudder
(13)
Vertical Stabilizer
(14)
Wing
(133)
Wing tip
(2)
Wiring
(18)
Sunday, December 16, 2012
More priming, now ready for riveting: 3.6 hours
Cleaned and primed the leading edge ribs.
I also built the leading edge stand used for holding the leading edge during riveting.
Finally I reassembled the leading edge in the stand.
Leading edge ready to rivet:
Newer Post
Older Post
Home