Construction progress and builder's log for my Van's RV-7 project N769WB
Labels
Aileron
(31)
Avionics
(72)
Canopy
(80)
Cowl
(28)
Electrical
(39)
Elevators
(36)
Empennage
(94)
fiberglass
(22)
Firewall Forward
(57)
Flap
(43)
Fuel System
(23)
Fuel Tank
(4)
Fuselage
(156)
Horizontal Stabilizer
(25)
Interior
(27)
Landing gear
(10)
Paint Schemes
(2)
Parachute
(30)
prop
(2)
Rudder
(13)
Vertical Stabilizer
(14)
Wing
(133)
Wing tip
(2)
Wiring
(18)
Saturday, December 1, 2012
Finished wing stand: 3.5 hours
I made and installed the adjustable arms that hold the main spar.
I copied this idea from another builder but it makes it very easy to insure there is no twist in the wing.
The threaded rod makes it easy to adjust.
Checking spar fit:
Newer Post
Older Post
Home