Cut a few pieces for the support arms.
Labels
Aileron
(31)
Avionics
(72)
Canopy
(80)
Cowl
(28)
Electrical
(40)
Elevators
(36)
Empennage
(94)
fiberglass
(22)
Firewall Forward
(58)
Flap
(43)
Fuel System
(23)
Fuel Tank
(4)
Fuselage
(156)
Horizontal Stabilizer
(25)
Interior
(27)
Landing gear
(10)
Paint Schemes
(2)
Parachute
(30)
prop
(2)
Rudder
(13)
Vertical Stabilizer
(14)
Wing
(133)
Wing tip
(2)
Wiring
(18)
Wednesday, November 28, 2012
Tuesday, November 27, 2012
Worked on wing stand: 5 hours
Came up with a plan for building my wing construction stands in the garage. Then I went out to Home Depot and Ace Hardware for materials.
I got the wood support post assembled and installed. For the other end of the support I will use an existing steel column.
I got the wood support post assembled and installed. For the other end of the support I will use an existing steel column.
Saturday, November 24, 2012
Worked on left wing skeleton: 9.2 hours
I started out by drilling holes for the plate nuts that will hold the in-wing landing lights. These lights go in the leading edge at the last bay before the wing tip. I'm planning on using LED's but I will just be installing the mounts for now.
After that I attached the leading edge ribs to the forward spar and match drilled them. Then I attached the main ribs to the front and rear spar and match drilled them.
I then disassembled everything and started deburring and prepping parts for priming. I got the spars and the leading edge ribs ready. I also started working on the main ribs but I still have quite a few to do.
After that I attached the leading edge ribs to the forward spar and match drilled them. Then I attached the main ribs to the front and rear spar and match drilled them.
I then disassembled everything and started deburring and prepping parts for priming. I got the spars and the leading edge ribs ready. I also started working on the main ribs but I still have quite a few to do.
Labels:
Wing
Friday, November 23, 2012
More rib prep: 2.5 hours
Finished fluting left wing ribs.
Located and drilled holes for electrical conduit, and snap bushings for pitot line, aoa line and antenna cables.
Located and drilled holes for electrical conduit, and snap bushings for pitot line, aoa line and antenna cables.
The large hole is for the flexible conduit and the 3 small ones are for aoa, antenna and pitot lines. 
Labels:
Wing
Thursday, November 22, 2012
Left wing rib prep: 5.1 hours
Smoothed all the edges on the left wing ribs. I also started straightening the flanges and fluting the ribs.
Labels:
Wing
Thursday, November 15, 2012
Friday, November 9, 2012
Worked on right rear spar: 2.7 hours
Got the right rear spar prepped and primed. Now ready to rivet. Definitely went faster than the left.
Labels:
Wing
Subscribe to:
Posts (Atom)