Labels

Tuesday, August 22, 2017

Priming and firewall forward work: 6 hours

The following work was done over several days:

  • Prepped and primed forward fuselage ribs and subpanel
  • Tested Perihelion servo controller for oil temp air valve
  • Figured out mounting location for oil temp servo in cockpit
  • Sealed firewall recess and lower corners of firewall with 3M Fire Farrier 2000+
  • Picked up battery boxes and windscreen roll bar parts from powder coater
  • Installed battery boxes on firewall


Gray substance is 3M Fire Barrier 2000+:

Powder coated battery boxes:

Priming in progress:

Mock up of oil temp control servo: