Labels

Thursday, August 24, 2017

Click Bond, oil cooler servo and started riveting: 6 hours


  • Prepped and installed about 14 Click Bond wire tie holders to help organize various wires and tubes running through the "tunnel" in the forward cockpit floor.
  • Fabricated a bracket to hold the cable that will control the oil cooler air valve. This will be installed in an extra rudder pedal mount hole.
  • Started riveting forward fuselage components.
  • Fabricated servo bracket for oil cooler air valve.
  • Installed servo bracket and cable guide.


Oil cooler servo and cable bracket in place:

Servo bracket finished:

Riveting adahrs doubler to subpanel:

Second round of Click Bond wire tie holders:

Cable bracket for oil cooler air valve:

First round of Click Bond wire tie holders: