- Installed backer plate and fuse block for G3X back up power.
- Riveted plate nuts on all avionics mounting parts that had been primed. Also riveted sub panel engine control bracket.
- Connected and torqued fuselage fuel lines getting ready for wing fit. The left fuel line to bulkhead fitting felt a little tight so I took it off and ground down a bracket to give it more clearance.
- Positioned fuselage in garage to fit wings. I had to do a little rearranging but with the fuselage diagonal in the garage the wings will fit on no problem.
Fuselage position for wing fit:
Fuel lines connected and wires temporarily tied down:
Andair fuel valve looks nice
Sub-panel engine control bracket modified to accommodate GTN-650 tray:
G3X back up power fuse block: