ADAHRS mounting and electrical: 3 hours

  • Cut out doubler for mounting dual GSU-25 ADAHRS (air data, attitude and heading reference system) to sub-panel.
  • Drilled and deburred doubler and subpanel for ADAHRS, rivets and platenuts.
  • Drilled left sub panel for pitot, aoa, and static air lines to supply ADAHRS. Also drilled a few large wiring pass through holes on both sub panels.
  • Drilled back up electrical bus bar to forward cockpit deck.


Backup electrical bus location:

GSU-25 in position on doubler and subpanel:

Working on doubler: