Construction progress and builder's log for my Van's RV-7 project N769WB
Labels
Aileron
(31)
Avionics
(72)
Canopy
(80)
Cowl
(28)
Electrical
(39)
Elevators
(36)
Empennage
(94)
fiberglass
(22)
Firewall Forward
(57)
Flap
(43)
Fuel System
(23)
Fuel Tank
(4)
Fuselage
(156)
Horizontal Stabilizer
(25)
Interior
(27)
Landing gear
(10)
Paint Schemes
(2)
Parachute
(30)
prop
(2)
Rudder
(13)
Vertical Stabilizer
(14)
Wing
(133)
Wing tip
(2)
Wiring
(18)
Saturday, March 12, 2016
Inside canopy taping and sanding: 4.5 hours
I finished putting two layers of electrical tape around the interior edges of the canopy then made considerable progress sanding the sikaflex and getting it ready for a cosmetic layer.
Ready for sanding:
Looks much better after the initial sanding:
Newer Post
Older Post
Home