Construction progress and builder's log for my Van's RV-7 project N769WB
Labels
Aileron
(31)
Avionics
(72)
Canopy
(80)
Cowl
(28)
Electrical
(39)
Elevators
(36)
Empennage
(94)
fiberglass
(22)
Firewall Forward
(57)
Flap
(43)
Fuel System
(23)
Fuel Tank
(4)
Fuselage
(156)
Horizontal Stabilizer
(25)
Interior
(27)
Landing gear
(10)
Paint Schemes
(2)
Parachute
(30)
prop
(2)
Rudder
(13)
Vertical Stabilizer
(14)
Wing
(133)
Wing tip
(2)
Wiring
(18)
Friday, March 4, 2016
Canopy front edge: 2 hours
I finished sanding the forward edge of the plexiglass and the sika to get it ready for a cosmetic coat of sika.
The edge of the plexi took the most time sanding with large blocks with 220 and 400 sandpaper.
No photos today.
Newer Post
Older Post
Home