Labels

Friday, February 1, 2013

Finished top skin riveting: 4.5 hours

The top skins are all riveted to the left wing structure. Now I will be working on the ailerons, flaps and installing various items inside the wing.

I'm still waiting on the fuel tanks. Installing the tank will be the last thing to be done before riveting the bottom skin on.

The riveting on this last part went well except for a small ding near the wing tip where I let the bucking bar slip. If I weren't painting the airplane I would be more upset.

 

Finished left top skins!