The rudder brace was challenging. The squeezer had to be fitted into the hole and carefully positioned.
Labels
Aileron
(31)
Avionics
(71)
Canopy
(80)
Cowl
(27)
Electrical
(38)
Elevators
(36)
Empennage
(94)
fiberglass
(22)
Firewall Forward
(56)
Flap
(43)
Fuel System
(22)
Fuel Tank
(4)
Fuselage
(156)
Horizontal Stabilizer
(25)
Interior
(27)
Landing gear
(10)
Paint Schemes
(2)
Parachute
(29)
prop
(2)
Rudder
(13)
Vertical Stabilizer
(14)
Wing
(133)
Wing tip
(2)
Wiring
(17)
Friday, August 10, 2012
Primed skeleton and started riveting: 4.9 hours
Got everything primed then riveted the skeleton together. There were some difficult rivets in several places. I used my hand rivet squeezer for the first time for some of these. It gives you more control but it takes a lot of effort to squeeze the 1/8" rivets. I'm glad to have the pneumatic squeezer for the majority of rivets. I also riveted the bottom of the counterweight skin on. I used the rivet gun but it's a very tight space and took a long time.