Labels

Sunday, November 16, 2014

Right seat and misc. work: 4.8 hours


  • fitted right seat back to cockpit
  • drilled hinge to right seat, deburred, prepped and primed
  • primed fuel tank bracket parts
  • started on adjustable fuselage stand to be used for mounting wings
Drilling hinge to seat back:

Thursday, November 6, 2014

Fuel tank bracket work: 5 hours


  • riveted left and right gear attach web to fuselage bulkhead (this is a part that is related to tricycle gear airplanes but still provides additional strength for tail draggers)
  • countersunk for left fuel tank bracket screws and rivets
  • fitted right fuel tank attach bracket and shims - this went much smoother and faster then the left side
  • countersunk right side and deburred all holes
No photos today

Wednesday, November 5, 2014

Fuel tank attach bracket: 5 hours


  • used the rivet gun to flatten a section of fluting where the support bracket mounts
  • drilled and fitted left support angle
  • I did not like the edge distance on some of the rivet holes so I remade the left support angle
  • made right support angle
  • made several sets of shims for the left side bracket before I was happy with them
  • the right side bracket work should go faster!
No photos today

Tuesday, October 14, 2014

Left seat audio wiring, and misc: 5.6 hours


  • Assembled left seat audio wiring harness (this was the bulk of the time)
  • Removed left seat
  • Located and drilled hole for seat heat wiring
  • Disassembled instrument panel structure
  • Started on fuel tank attach support brackets
Working on audio wiring harness:

Left and right audio wiring harness complete:

Monday, October 13, 2014

Seat work and misc: 1.2 hours


  • Tested the left seat heater. It does not use very much power - 3amps in high and 1 amp in low. This includes upper and lower panels.
  • Prepped left seat headset audio wiring harness materials

Sunday, October 12, 2014

Seat work, headset jack wiring harness, misc: 7.5 hours


  • Prepped and painted left seat back hinge
  • Made wiring labels for headset wiring harness
  • Worked on more paint removal from interior panels
  • Made headset audio harness for right seat (a lot of soldering, heat shrink tubing, crimping, testing, etc.) - this includes standard aviation mic and headphone jack and a Bose lemo jack which includes power for ANR headsets
  • Riveted left seat back hinge
  • Test fitted seat
  • Researched seat heater wiring

Right seat audio harness complete:

Left seat looks great!

The seat is very comfortable. Tron is disappointed he doesn't have a seat but he's still ready to go.

Shorter flights are probably better for him:

Saturday, October 11, 2014

Organized hardware, fitted left seat: 4 hours


  • Organized hardware
  • Ordered stainless steel hardware for cabin heat valve and some extra angle for instrument panel
  • Fitted left seat
  • Made stainless steel hinge pins for both seat backs
  • Drilled and prepped left seat back hinge for riveting
  • Started prep on right seat back hinge
Drilling hinge to seat back: