Labels

Saturday, October 11, 2014

Organized hardware, fitted left seat: 4 hours


  • Organized hardware
  • Ordered stainless steel hardware for cabin heat valve and some extra angle for instrument panel
  • Fitted left seat
  • Made stainless steel hinge pins for both seat backs
  • Drilled and prepped left seat back hinge for riveting
  • Started prep on right seat back hinge
Drilling hinge to seat back: