Construction progress and builder's log for my Van's RV-7 project N769WB
Labels
Aileron
(31)
Avionics
(72)
Canopy
(80)
Cowl
(28)
Electrical
(39)
Elevators
(36)
Empennage
(94)
fiberglass
(22)
Firewall Forward
(57)
Flap
(43)
Fuel System
(23)
Fuel Tank
(4)
Fuselage
(156)
Horizontal Stabilizer
(25)
Interior
(27)
Landing gear
(10)
Paint Schemes
(2)
Parachute
(30)
prop
(2)
Rudder
(13)
Vertical Stabilizer
(14)
Wing
(133)
Wing tip
(2)
Wiring
(18)
Sunday, November 16, 2014
Right seat and misc. work: 4.8 hours
fitted right seat back to cockpit
drilled hinge to right seat, deburred, prepped and primed
primed fuel tank bracket parts
started on adjustable fuselage stand to be used for mounting wings
Drilling hinge to seat back:
Newer Post
Older Post
Home