Sunday, November 30, 2014

Gusset install, spar carry bolts, etc: 3.4 hours


  • Installed left and right gussets (used drift pins to line them up with spar), torqued and sealed bolts
  • Installed twelve an4 bolts in spar carry through, torqued and sealed. (These are bolts that are left off on the quick build fuselage to give the builder the option of tricycle landing gear.)
  • Worked on right forward spar cover

Left gusset and six an4 bolts installed:

Right forward spar cover:

Right gusset installed: