Labels

Thursday, September 14, 2017

Cockpit and wiring: 3 hours


  • Started drilling some additional wiring pass through holes in the fuselage floor to accommodate the wiring that will go out to the wings.
  • Drilling the inner wiring holes through the floor ribs is tricky and requires the angle drill.
  • I opened up the holes slightly then used some e6000 to glue the engine control label placard to the control bracket. 


Engine control cables in place to hold the label placard on:

The placard turned out nice:

One fuselage floor rib wiring hole complete:

The left and right wiring pass throughs are new: