Lots of wiring and related items going on.
- Drilled 2 new wiring pass through holes in spar carry through web on left and right sides
- Drilled a few small pass through holes aft of the spar for RG-400 cable
- Pulled AOA, pitot and static pneumatic tubes through spar carry through
- Pulled a variety of other wires and cables through spar carry through
- Mounted a bunch of clickbond wire tie holders on vertical surfaces
- Mounted a bunch of wire tie holders secured with E6000 on horizontal surfaces
- Crimped on BNC connectors for the comm radio and transponder antennae
- Broke in the heat shrink wiring label printer
- Mounted the fire extinguisher bracket
- Bonded on terminal strip for Aeroled nav / strobes
Terminal strip block secured with E6000 (for Aeroled lights) and transponder RG-400 on right:
Getting more organized (clear plastic pieces are clickbond pieces being bonded):
Mounted fire extinguisher bracket on left carry through cover:
First use of the dymo heat shrink wiring label printer:
Crimping BNC connector witht the help of Stein's video:
Pitot, aoa, static pneumatic lines pulled and some misc cables:
Spar carry through web before start of wire pulling:
Close up of 2 new wiring pass through holes on left side: