Labels

Friday, December 19, 2014

More fuel system covers and forward cover work: 3.8 hours

  • Trimmed forward tunnel cover and heat baffle to fit fuel pump mount
  • Located holes for tunnel cover plate nuts then drilled floor angles and tunnel cover with angle drill
  • Drilled fuel pump mount and valve cover for plate nut rivets
  • Deburred, dimpled and countersank the above parts for plate nut rivets and primed
Fitting forward tunnel cover / heat baffle:

Drilling cover to floor angles:

More priming: