Labels

Sunday, December 21, 2014

Forward cover and firewall: 4.2 hours


  • Riveted heat distribution baffle to center tunnel cover
  • Riveted 11 plate nuts to center tunnel cover
  • Used dremel to cut 2" hole in firewall for cabin heat valve
  • Temporarily installed cabin heat valve
  • Researched fuel line and other firewall penetrations
  • Removed rivet from firewall for fuel fitting doubler
Riveting platenuts to tunnel cover / heat baffle:

More riveting:

Locating 2" cabin heat hole on firewall:

Fine tuning the heat opening:

Cabin heat valve temporary install: