Labels

Tuesday, September 16, 2014

Flap sensor and baggage wall work: 3.6 hours


  • I attached a small electric connector (from an RC servo) to the flap position sensor. 
  • Fabricated the shoulder harness cable wear blocks
  • Drilled and installed plate nuts for wear blocks and baggage wall
  • Prepped baggage wall panels for painting
Connectors for flap position sensor:

Working on harness cable wear blocks: