Labels

Thursday, November 16, 2023

Update from August through December 2022:

 I have been slack about updating the blog but the work on the RV-7 has been slowly continuing!


Slot for canopy lock:

Canopy lock with ground down lock tab:


Sealed the firewall penetrations with 3m fire barrier caulk:

Torqued and safety wired prop bolts:





Upper gear leg intersection fairings are done:

Sanded and primed spinner:



Cowl inlet baffles complete:


A lot of work to get the fairings looking good:




More work on the “endless” cowling:

Paul is always a good sport!