I have been slack about updating the blog but the work on the RV-7 has been slowly continuing!
Slot for canopy lock:
Canopy lock with ground down lock tab:
Sealed the firewall penetrations with 3m fire barrier caulk:
Torqued and safety wired prop bolts:
Upper gear leg intersection fairings are done:
Sanded and primed spinner:
Cowl inlet baffles complete:
A lot of work to get the fairings looking good:
More work on the “endless” cowling:
Paul is always a good sport!