Labels

Monday, November 23, 2020

Snorkel install and more engine details

 

SDS cnc’d valve covers and all engine wiring installed. Almost done with the engine!



The new valve covers are a modern o-ring design which should make them leak free.

Routing the spark plug wires took a lot of time to insure they would not rub on anything:

The alternate air door opens and closes easily. I’m very happy with the fit


More spark plug wire routing progression:

Deutsch plug for reiff sump heaters:

Another deutsch plug for the cowl flap:

I tried to get the egt probes located the same distance from the exhaust flange. It’s a ball park thing because all the pipes have some curve. 

Engine driven fuel pump drain tube:

Sniffle valve drain:

Cabin heat duct routing:

The snorkel looks great installed: