The following items were done over multiple days...
- Did more sanding, filling and epoxy coating of oil cooler duct
- Used flox mixture to get a better fit between oil cooler duct and oil cooler flanges
- Drilled oil cooler duct for AN3 bolts also spent a fair amount of time carving out space for bolt heads on duct
- Worked on planning location of firewall items and penetrations
- Made copper bus bars to tie ANL fuses and battery / starter contactors together
ANL fuse holders and contactors:
Oil cooler duct with clear epoxy:
Filling gaps with flox: