Construction progress and builder's log for my Van's RV-7 project N769WB
Labels
Aileron
(31)
Avionics
(72)
Canopy
(80)
Cowl
(28)
Electrical
(39)
Elevators
(36)
Empennage
(94)
fiberglass
(22)
Firewall Forward
(57)
Flap
(43)
Fuel System
(23)
Fuel Tank
(4)
Fuselage
(156)
Horizontal Stabilizer
(25)
Interior
(27)
Landing gear
(10)
Paint Schemes
(2)
Parachute
(30)
prop
(2)
Rudder
(13)
Vertical Stabilizer
(14)
Wing
(133)
Wing tip
(2)
Wiring
(18)
Wednesday, April 27, 2016
Finished sanding canopy: 2.5 hours
Finished sanding the sika joints on the canopy frame. Started taping the canopy for priming.
I got some very expensive 3m vinyl masking taping from the auto paint supply to use on the edges.
Finished sanding then removed old tape and plastic from the inside.
Newer Post
Older Post
Home