Labels

Monday, March 9, 2015

Forward fuselage, vent brackets etc.: 5.5 hours


  • Finished rough cutting and smoothing vent / 12 volt / control brackets left and right
  • Deburred, smoothed, dimpled forward top fuselage structure
  • Re-assembled above structure and clecoed skin on using 3 ratchet straps - the front corner of the skin is not matching up very well so I emailed Vans for suggestions.
  • Started locating roll bar position
  • Made a very small adjustment to the roll bar  - it took a long time with a lot of small tweaks
Vent brackets are pretty much finished:

Tightening down the skin:

Not a good fit here:

Or here: