Labels

Tuesday, December 31, 2013

Worked on flight controls: 5.3 hours

I got started making preparations for mounting the various pieces of the flight controls that connect the two joysticks to the ailerons and elevator.

Several floor ribs need to be modified for proper clearance. This is a bit of a hassle because they are already installed.

I also worked on the bushing for the left joystick mount and installed a lot of snap bushings in the wing carry through structure.

Also a few random photos...

The blue marked area has to be cut / ground out.

 

One of our cats was working on his plane. He's farther along than me but I think mine will fly better...

 

A good looking RV-6 I saw at Palm Springs: