Labels

Friday, August 30, 2013

More flap work: 3.5 hours

I made more progress on the right flap. I finished the bracket that the electric flap actuator connects to. I also got the hinge drilled to the flap spar. The only thing left to do is countersink the flap spar then I will be ready to deburr, dimple and prime everything.

 

Drilling the hinge to the spar: