Labels

Tuesday, March 19, 2013

Finished brackets on left aileron: 1.5 hours

I used my trusty Makita grinder to do a little surgery on a socket for the AN3 bolts that hold the aileron brackets on. After that it was a relatively quick job to torque the brackets down. I rehung the aileron to get it out of the way while I build the right aileron.

I also gathered all the parts for the right aileron.

 

The modified socket and inch - lb torque wrench:

 

Front of inboard bracket:

 

Another bracket shot: