The last thing I did was fine tune the fit of the trailing edge pieces then epoxy it together on my aluminum angle template.
Next steps will be riveting the trailing edge then rolling the leading edge.
The installed counter weight. The orange dots (torque seal) are to indicate that the bolts have been torqued to the correct value.

My beautiful assistant with the squeezer. That long yoke on the squeezer made it possible to reach every rivet without having to use the rivet gun.
