Labels

Thursday, November 22, 2012

Left wing rib prep: 5.1 hours

Smoothed all the edges on the left wing ribs. I also started straightening the flanges and fluting the ribs.

 

Rib flange straightener in action:
 

Straightened and fluted ribs:
 

 

Thursday, November 15, 2012

Friday, November 9, 2012

Worked on right rear spar: 2.7 hours

Got the right rear spar prepped and primed. Now ready to rivet. Definitely went faster than the left.

 

Priming done.
 

Ready to rivet.
 

Thursday, November 8, 2012

Finished left rear spar prep, started on right: 6.4 hours

Riveted all left rear spar components together. I had a two tricky rivets that had to be redone but everything else went well.

After that I started prepping the rear spar components.

 

Riveting the aileron bracket doubler:
 

Inboard spar doublers (extra holes are where ribs and other parts are riveted during assembly):
 

Ready to trim right rear spar doublers:


Wednesday, November 7, 2012

Started on left rear spar: 9 hours

I got the left rear spar all the way to the point of riveting.

There was a fair amount of time spent reviewing the plans and researching techniques online. I think the right rear spar will go a bit faster.

I did all the edge finishing on the rea spar components, then I match drilled all the doublers to the rear spar. After I made some modifications (grinding) to the pneumatic squeezer I was able to dimple the appropriate holes on the rear spar and doublers. Then I scuffed and cleaned everything. Then primed all pieces. Tomorrow I will rivet it all together.

 

Edge finishing the rear spar pieces:
 

Making the clearance hole for the aileron pushrod in one of the doublers (the Dremel has been indispensable)
 

Match drilling the inboard spar doublers:
 

Tuesday, November 6, 2012

Finished tie down assemblies and attached to spars: 3.2 hours

Riveted the spacers and nut plates to the tie down brackets then bolted them and the aileron bell rank brackets to the spars.

 

Competed tie down assembly:
 

Aileron bell crank brackets:
 

Monday, November 5, 2012

Worked on wing tie down brackets: 6 hours

Worked on match drilling the tie down brackets. This took a while due to lining up and drilling through the spacers.

I also drilled the spacers and tie downs for the plate nut rivets. Then I primed the tie down blocks.

Tie down bracket with removable stainless tie down ring:
 

Tie down spacers: