Forward fuselage, vent brackets etc.: 5.5 hours


  • Finished rough cutting and smoothing vent / 12 volt / control brackets left and right
  • Deburred, smoothed, dimpled forward top fuselage structure
  • Re-assembled above structure and clecoed skin on using 3 ratchet straps - the front corner of the skin is not matching up very well so I emailed Vans for suggestions.
  • Started locating roll bar position
  • Made a very small adjustment to the roll bar  - it took a long time with a lot of small tweaks
Vent brackets are pretty much finished:

Tightening down the skin:

Not a good fit here:

Or here:

Saturday, March 7, 2015

Painting and misc: 3 hours


  • Prepped and primed roll bar and canopy frame
  • Bought defog fan mounting hardware and checked fit
  • Removed paint from some interior parts needing repainting
  • Started work on finishing left and right custom brackets for air vents and 12 volt power etc.
Initial vent brackets I designed and Front Panel Express cut out. Their process worked great. Great quality!

Priming roll bar and canopy frame:

Working on vent brackets (if my cad software skills were better Front Panel Express could have done this!):

Thursday, March 5, 2015

Defog fan cut out and misc: 3 hours


  • Finished defog fan cutouts
  • Prepped canopy frame and roll bar for painting
  • Re-organized shop area
  • Deburred, edge rolled and dimpled parts of forward top skin
Dimpling top skin:

Wednesday, March 4, 2015

Defog cut out and interior painting: 3.5 hours


  • Prepped and sprayed some interior panels with catalyzed gloss clear epoxy - 2k Aerospray by Eastwood. This product mixes in the spray can so very easy to use and no clean up.
  • Worked on left defog fan cutout.
This clear epoxy is supposed to be very tough:

Defog fan cutouts almost done:

Tuesday, March 3, 2015

Defog fan cutouts: 3.3 hours


  • Received two 12 volt 92mm fans for defog
  • Finished fan cutout template
  • Center punched screw holes and traced template onto skin
  • Used unibit, dremel, nibbler and files to make cutouts - right side finished
Cutouts in progress:

Tracing template:

Monday, March 2, 2015

Misc errands and painting: 4 hours


  • Dropped off my instrument panel blank with a local CNC machine shop to be cut out
  • Picked up new horizontal stabilizer kit and Aeroled nav strobes package from Van's
  • Prepped and primed canopy parts and controls sticks what had powder coat removed.
No photos today.

Sunday, March 1, 2015

Defog fan cut out design: 3 hours


  • Worked on defog fan cutout design
  • I will be using two 92 mm fans for windscreen defog. This is similar to what Vans uses for the new RV-14.
No photos